PSA 8.3 — Buried Piping: Soil Springs, Virtual Anchor Length and the Transition
A 12″ buried transfer line comes up out of the ground at a valve station, turns through a 90° elbow, runs 4 m to a motor-operated valve and turns again. The stress engineer models the above-ground spool and puts an anchor at the ground line — the buried pipe is held by the soil, so it cannot move. The spool passes everything comfortably.
Eighteen months later the weld at the first above-ground elbow is leaking, and a crack survey finds the second elbow cracked too. The buried line is intact along its whole length.
Commit to an answer before reading…
🔒 Members only
The rest of this lesson is in the members' libraryThe full text, the 3D model, the worked example and the quiz.
Join to read it →A members' lesson from EPiC Circle
This one is part of the members' library — the full lesson, its 3D model, the worked example and the quiz open with membership. Dozens of lessons across every EPC discipline are free to read without an account.
See what's free →Educational teaching material — simplified and illustrative. Not for engineering
design use.